How to construct the roof cement ceramic particle board? Let me tell you.
1, Material requirements
P. O32.5 cement, fly ash, clay ceramic particles, etc
2, Main equipment
1. Mobile equipment: mortar mixer, iron rolling roller.
2. Construction tools: large and small shovels, iron plates, hand carts, wooden trowels, rulers, etc.
3, Working conditions:
1. Clean up the garbage, debris, etc. on the roof, and use a chisel to chisel off the cement slurry and ash protruding from the base layer and clean it up; After sealing various roof pipes tightly and passing self inspection, report to the project department for acceptance.
2. Use ceramic particles to fill the slope layer with hot water in advance, and the filling time meets the requirements
4, Operation process
1. Cleaning the grassroots: Clean up the garbage, debris, and other debris on the roof.
2. Terracotta slope finding 2%:
1) During construction, find a 30mm thin slope layer and a 5% slope for the rainwater outlet. For the convenience of drainage, a slope of 2% should be made along the length direction of the drainage ditch.
2) During the construction process, the thickness is calculated based on the length and width dimensions of the slope, and then the pole is erected as a marker to facilitate thickness control during the construction process. The evenly mixed materials are then laid out in sequence. Material mixing sequence: ceramic particles+a small amount of fly ash+cement+water. During mixing, the aggregates need to be mixed evenly before adding water. Water should be added appropriately as needed.
3) Before construction, carefully check the elevation of the roof structure to ensure that the waterproof layer of the roof is not less than 25cm high.
4) Strictly control the elevation during the laying process, lay lines and level them layer by layer, and check them one by one with a slope ruler to ensure the correct slope direction.
5) During construction, it is strictly prohibited to stack materials in a centralized manner on the floor to avoid adverse effects on the structural floor slab. After leveling and compacting the slope layer, apply a 20mm thick 1:3 cement mortar (volume ratio) leveling layer on top and smooth the surface.
5, Quality requirements
1. Requirement: 1.1 Cement ceramic aggregate concrete should be mixed evenly, laid in layers, compacted appropriately, and the surface should be flat and dense. 1.2 Correct slope finding, no reverse slope or accumulated water, with the slope facing the rainwater outlet.
6, Protective measures
1. On site construction personnel need to wear protective equipment.
2. Avoid construction on the roof when there are strong winds and rain above level 5 (including level 5).
3. Illegal operations are strictly prohibited on the construction site.